Overseas performance

본문 바로가기

Outstanding performance

Canada-NEXTSTAR ENERGY
LGES&Stellantis JV Coater
Exhaust duct fabrication and installation (Unit 1)
LGES&Stellantis JV Coater
Exhaust duct fabrication and installation (Unit 2)
LGES&Stellantis JV Coater
Exhaust duct fabrication and installation (Unit 3)
LGES&Stellantis JV Coater
Exhaust duct fabrication and installation (Unit 4)
CKCA-Hookup
2501-02 NEXTSTAR ENERGY # hookup
CKCA
202407001 NEXTSTAR ENERGY Additional 1st(night, rooftop waterproofing)
CKCA
202411001 NEXTSTAR ENERGY #Additional 2nd (Ladder, Fan production)
CKCA
202407001 NEXTSTAR ENERGY #Additional 3rd(jumping duct closing cap, etc.)
LG&HONDA in Ohio, USA
COATER DUCT(ANODE)
HUMIDIFICATION SYSTEM
US-LG Solutions Arizona
ESHG Electrode
#1 installation of Duct, Piping of Hot Oil (ESHG#1)
ESHG Electrode
#2 installation of Duct, Piping of Hot Oil
ESHG Electrode
#3 installation of Duct, Piping of Hot Oil
ESHG Electrode
#1 installation of Duct, Piping of Hot Oil
Hungary W-SCOPE
WHP
dry room installation work
Hungary-SK
SK ON HUNGARY
FACTORY2 NMP DUCT WORK
SKOH Formation
New Auxiliary Equipment Project UT
SKOH Formation
New auxiliary equipment project UT others
SK ON HUNGARY
FACTORY2 Plumbing
SK ON
(3-8-8-5) NMP DUCT WORK
SK ON
Hook Up
Hungary SKBH
Hook-Up Phase 1 Construction (Phases 1 and 2)
Hungary SKBH
Hook-Up Phase 2 Construction (Phase 1)
Hungary-SDI
Hungary SDIHU
Construction of dry rooms at SDIHU Plant 1 in Hungary, Lines 1 and 2 (winding, stacking)
Hungary Stack
#3,4 Line, Electrode 64M Dry room Construction(Duct Construction)
SDIHU Plant 2 STACK
Line #5,6 Electroplate Dry Room Construction
SDIHU Hungary Plant 2
Lines #9 and 10 Mixing, Plate, and Punching Duct Construction
SDIHU
#11,12 Line Dryroom Construction
SDIHU 2nd-2 Factory
#13, 14 Electrode Line Duct Extension Project
SamsungSDI
Hungary Infrastructure Direct Project
SDIHU Plant
1 Multi 4 Stack Dry Room Assembly Works (Onsite Duck works)
Hungary-EcoPro
Ecopro
battery duct installation work
Polish LG Chemical coater
Poland LG Chemical
Coater Duct/Heat Pipe Construction in Poland
Malaysia-SDI
SDIEM
Circular Plant 2 Expansion Project PHASE 1 (DUCT)
SDIEM
Duct work during the SDIEM prototype 2nd plant expansion

Corporate name Top Engineering Co., Ltd. Representative name Jo, Ki-Hoon Head Office Address 226, Buldang 25-ro, Seobuk-gu, Cheonan-si, Chungcheongnam-do, Republic of Korea Room 625 6F(Golden Square 2) Factory Address 214-3, Wolsan-ro, Eumbong-myeon, Asan-si, Chungcheongnam-do, Republic of Korea Business registration number 312-86-65458

Tel 041-522-7122

Copyright © Top Engineering All rights reserved.